Representative Projects
Engineering Support to Install an Industrial Track Spur Starfire was commissioned to develop the engineering specification document and production drawings package necessary to install an industrial track spur to service a new production facility being constructed in the New Century Air Center in New Century, Kansas. The track spur will be used for unloading edible oils from tank cars. Given the nature of the topography adjacent to the plant site, the project required careful provisions for adequate drainage of the work site. The new track spur is connected to track operated by the New Century Air Center, which then connects to the nearby Class One main line. |
|
|
|
|
|
|
|
|
|
|
|
| |
![]() |
![]() |
|||||||
|
|
|||||||||
|
|
|||||||||
|
|
|||||||||
|
|
|||||||||
|
|
|||||||||
|
|
|||||||||
|
|
|
||||||||
![]() |
|||||||||
![]() |
![]() |
![]() |
![]() |
|
![]() |
![]() |
|||